News Flash

Home

Posted on: March 17, 2021

Construction Resumes Along I-43

WisDOT has resumed construction work along I-43. Walworth County residents are advised to take note of the following anticipated closures: 

  • Single-lane closures in each direction along I-43 will begin in mid-March, with work zones being staggered and limited to four miles in length. 
  • Overnight, short-term ramp and adjacent crossroad closures. 
  • Overnight, intermittent full freeway closures, as needed. 
  • Long-term ramp closures to allow for bridge painting, pavement repairs and drainage improvements at: 
  1. County Road X 
  2. WIS 67 (will not be closed concurrently with US 12 ramp closures) 
  3. US 12 (will not be closed concurrently with WIS 67 ramp closures) 
  4. WIS 50 
  • The WIS 67 (Lincoln Street) bridge over I-43 requires a 60-day full closure anticipated to begin March 29 and reopen approximately May 28.


View the WisDOT press release.

 Map of WIS 67 bridge closure with alternate routes

View the project website.
Facebook Twitter Email